BREAKING NEWS
 

High tides halt Perranporth beach path work

Trusted article source icon
Saturday, October 27, 2012
Profile image for West Briton

West Briton

WORK to create a £70,000 concrete footpath across Perranporth's beach ground to a halt during last week's high tide.

Workmen had to down tools on the scheme, which aims to make the beach more accessible to wheelchair users and those with pushchairs, after water flooded the site.

  1. The very high tides of last week swamped the footbridge at Perranporth beach and brought to a  halt work to construct a £70,000 concrete footpath across the sand.

    The very high tides of last week swamped the footbridge at Perranporth beach and brought to a halt work to construct a £70,000 concrete footpath across the sand.

Parish councillor Alan Ratcliffe, who is heading the project, said it had been delayed by several weeks.

"We knew there would be high tides but decided to press on. All of the (concrete) base has been pinned to the bedrock with resin and stainless steel," he said.

Business Cards From Only £10.95 Delivered www.myprint-247.co.uk

myprint-247

View details

Print voucher

Our heavyweight cards have FREE UV silk coating, FREE next day delivery & VAT included. Choose from 1000's of pre-designed templates or upload your own artwork. Orders dispatched within 24hrs.

Terms: Visit our site for more products: Business Cards, Compliment Slips, Letterheads, Leaflets, Postcards, Posters & much more. All items are free next day delivery. www.myprint-247.co.uk

Contact: 01858 468192

Valid until: Sunday, June 30 2013

"It has just washed sand into the hole. The workmen will dig out the sand once the tide has dropped. Everything is on schedule and on time."

But local resident Ian Hampton has raised concerns about sand blocking the path once it has been constructed.

He wrote on the Please Listen Perranzabuloe Parish Council Facebook site: "When the path is finished, who is going to maintain it? Who is going to clear the sand away from it to allow the access required for wheelchair users?

"This year, on more than one occasion I have taken a shovel and cleared the steps of clogged-up sand but surely this should be the responsibility of the council?

"If they cannot be bothered to maintain the steps what chance the path?"

But Mr Ratcliffe said the path would remain clear of sand during the busy summer season, when high tides do not occur, and said it would be cleared at other times when necessary.

0
Tweet this article
Report

Your comments awaiting moderation

Be the first to comment

max 4000 characters
 
 
 
 
 
 

Tell us about your area

Got some interesting news? Write about it and let your whole community know.

  Write an article